Installation recommendations

Floating dry floor screed

on wooden beam floor with existing planking

1. 22/25 mm flooring panel or cement fibreboard

2. 2.5 mm MEHARIPP or 8/10 mm MEHASOL

3. Approx. 10-80 mm MEHABIT

4. MEHAFIPP as trickle protection (if necessary)

5. Existing wooden floor boards

6. Wooden beam floor with heavy filling (loam, cinder)

  • 1. 22/25 mm flooring panel or cement fibreboard

  • 2. 2.5 mm MEHARIPP or 8/10 mm MEHASOL

  • 3. Approx. 10-80 mm MEHABIT

  • 4. MEHAFIPP as trickle protection (if necessary)

  • 5. Existing wooden floor boards

  • 6. Wooden beam floor with heavy filling (loam, cinder)

Floating dry floor screed

on wooden beam floor with heavy filling

1. 22/25 mm flooring panel or cement fibreboard

2. Sound insulating mat (optional)

3. 8/10 mm MEHASOL load distribution plate

4. Approx. 10-80 mm MEHABIT

5. Wooden beam floor with heavy filling (loam, cinder)

  • 1. 22/25 mm flooring panel or cement fibreboard

  • 2. Sound insulating mat (optional)

  • 3. 8/10 mm MEHASOL load distribution plate

  • 4. Approx. 10-80 mm MEHABIT

  • 5. Wooden beam floor with heavy filling (loam, cinder)

Dry floor screed

on uneven concrete surface (full-area processing of fill)

1. 22/25 mm flooring panel or cement fibreboard

2. 2.5 mm MEHARIPP or 8/10 mm MEHASOL

3. Approx. 10-80 mm MEHABIT for compensating unevenness and for covering cable bundles

4. 150 mm solid layer with moisture barrier

  • 1. 22/25 mm flooring panel or cement fibreboard

  • 2. 2.5 mm MEHARIPP or 8/10 mm MEHASOL

  • 3. Approx. 10-80 mm MEHABIT for compensating unevenness and for covering cable bundles

  • 4. 150 mm solid layer with moisture barrier